Planning a Leak Test System

Made in the USA

A planning guide for manufacturers

Plan a leak test system from the reject leak rate, the part, the rate you need and how much automation the volume justifies. Then prove the test on real parts before committing. LeakMaster samples parts to do exactly that.

Manual station or automated machine?

If you…Consider
Test moderate volumes with an operator availableManual leak test station
Need high rate, multiple parts at once, or no operatorAutomated leak test machine
Already have an instrument but unreliable resultsNew seal tooling and fixturing

What to send EAC

  1. Reject leak rateWhat defines a bad part, and at what pressure.
  2. PartsDrawings or samples.
  3. RateParts per hour and shifts.
  4. SealingHow the part can be sealed. Most leak test problems are here.
  5. Quality requirementsValidation, data logging and calibration traceability.
  6. Floor spaceWhere the system will sit and how parts arrive.

Contact Us

(215) 855-8777 ☎ Sales@eac-co.com ✉
What are you requesting?
What are you interested in?